Week 8 Progress at Alameda

The progress at our Alameda remodel is remarkable.  What a difference paint, cabinets, and reclaimed oak floors have made!

This project is SBaird Design’s first collaboration with Edmiston Design Build.  The attention to detail from Heather Scannell has been much appreciated.  Thank you to Shane for accepting our drawings that had previously been completed and updating them when needed and to Blair Edmiston for his patience and diligence during our weekly 3 hour design development meetings  prior to construction.  Jeremy, Edmiston’s on-site carpenter, has been so gracious and respectful of our client’s needs during construction.

This is also our first time working with Creative Creations Cabinetry.  SBaird Design is impressed with John’s craftsmanship, precision, and perfectionism.

kitchen paint & cabinets

master bath:  WC, vanity, shower, closet

hall bath paint, new cabinets

Advertisements

Leave a comment

Filed under color, design, Remodeling

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s