Manzanita project update

We are in our 9th month of the extensive remodel of a 1969 home on the ocean in Manzanita, Oregon.

The very slightly pitched flat membrane roof is on, Kolbe CVG fir interior and clad exterior windows were installed, the ipe soffits are up, copper flashing is on, wood burning rais fireplace is in, electrical, sound system wiring, rough in plumbing, insulation is done, the radiant floor heat is being installed, the deck framing is up, sauna and outdoor shower has been framed out and the ipe siding is about to commence. The home is starting to take shape in it’s appearance. An absolute jewel box it will be.

P1050004_5_6_7_8 P1050009_10_11_12_13 P1050019_20_21_22_23_tonemapped P1050057_58_59_60_61

Advertisements

Leave a comment

Filed under construction, design, manzanita, Remodeling, Restoration, Uncategorized

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s